to get additional power from the local utilities. Increasing the efficiency of existing systems could also allow companies to continue to use existing buildings and still expand datacenter capacity.
A high-voltage power system like that from Validus requires substantial installation and investment, including running large diameter cabling from the utility pad outside into the datacenter, installing the 575-to-48-VDC converters for each rack, and converting servers to 48 VDC. However, saving 50 percent or more on power over many years represents a big return. For companies that are unable to increase datacenter capacity by buying more power capacity, turning to DC may be the only solution.